Peterhead Flexpower
A planned grid-scale battery storage project designed to balance renewable energy supply for the UK electricity grid
Highlights
- New on EvolcAdded 2026-11-01
About Peterhead Flexpower
Peterhead Flexpower is developing a 500 MW, two-hour battery energy storage system near Peterhead, Scotland. The project is designed to store electricity and discharge it to the national grid as needed.
The project is at the ECU application consideration stage. Construction is planned for 2030, with connection to the grid planned for 2033.
Product: A planned grid-connected battery energy storage system with 500 MW power and 1,000 MWh storage capacity.
Jobs at Peterhead Flexpower
More energy & climate companies
Petrostrat
Biostratigraphy, sedimentology and lab analysis that supports subsurface modelling for energy companies, from North WalesNew on EvolcRemote-friendlySalary transparentPhase Biolabs
Converts industrial CO2 into ethanol via fermentation, retrofitted to existing plants as a bolt-on unitNew on EvolcPhuel Oil Tools
Wireline pressure control equipment and well intervention tools for oil and gas operators in the North SeaNew on EvolcPlexus Holdings PLC
Wellhead, tree and valve equipment with patented POS-GRIP seals for oil and gas operatorsNew on EvolcPMG Services (Bristol)
Waste recycling, specialist vehicle hire and environmental services for commercial, infrastructure and public-sector clientsNew on Evolc
Website technologies
Tools and platforms detected on this company’s website, grouped by purpose. Dates record when Evolc observed them.
Content delivery
- CloudflareHigh confidence
- First detected
- Last detected
- Last checked
Detection evidence
- Website resourcedeclared script/iframe or software asset
Frontend frameworks
- Tailwind CSSMedium confidence
- First detected
- Last detected
- Last checked
Detection evidence
- Page markupsoftware structure signature
Website detection does not establish a paid subscription or company-wide use. Tools loaded after consent or sign-in may be missed. “No longer observed” does not prove the company stopped using a tool.