Open tenders for KLIMASERVIS SŮVA
766 open tenders fit what KLIMASERVIS SŮVA offers; 20+ come from public bodies that already sign contracts with KLIMASERVIS SŮVA.
Tenders that fit what KLIMASERVIS SŮVA offers
Closest in meaning to its products: Ventilation and air-conditioning systems, self-made ductwork, MaR, heating and smoke extraction installed for construction projects · HVAC contractor supplying ventilation, air conditioning and self-made ductwork for general contractors across the Czech Republic. Tenders in other languages match too. Best fit first, top 20 of 766.
Raumlufttechnische Anlagen
Fits: Ventilation and air-conditioning systems, self-made ductwork, MaR, heating and smoke extraction installed for construction projects
Lüftungsarbeiten
Fits: Ventilation and air-conditioning systems, self-made ductwork, MaR, heating and smoke extraction installed for construction projects
Lüftungsanlage
Fits: Ventilation and air-conditioning systems, self-made ductwork, MaR, heating and smoke extraction installed for construction projects
Raumlufttechnische Anlagen
Fits: Ventilation and air-conditioning systems, self-made ductwork, MaR, heating and smoke extraction installed for construction projects
VE 4075 Lüftungsanlagen
Fits: Ventilation and air-conditioning systems, self-made ductwork, MaR, heating and smoke extraction installed for construction projects
VE 4313 - Lüftung
Fits: Ventilation and air-conditioning systems, self-made ductwork, MaR, heating and smoke extraction installed for construction projects
Lueftungsanlagen
Fits: Ventilation and air-conditioning systems, self-made ductwork, MaR, heating and smoke extraction installed for construction projects
Heizungsarbeiten
Fits: Ventilation and air-conditioning systems, self-made ductwork, MaR, heating and smoke extraction installed for construction projects
Mise en place d'un système de ventilation double flux et chauffage-rafraichissement au centre aéré et au club jeunes
Fits: Ventilation and air-conditioning systems, self-made ductwork, MaR, heating and smoke extraction installed for construction projects
Waerme und Kaelteversorgungsanlagen
Fits: Ventilation and air-conditioning systems, self-made ductwork, MaR, heating and smoke extraction installed for construction projects
202 - Lüftung
Fits: Ventilation and air-conditioning systems, self-made ductwork, MaR, heating and smoke extraction installed for construction projects
Construction d’une école fondamentale et transformation d’une cuisine professionnelle à Vichten – Travaux de chauffage, ventilation et sanitaire
Fits: Ventilation and air-conditioning systems, self-made ductwork, MaR, heating and smoke extraction installed for construction projects
Klimatizace 2026 - 2029
Fits: HVAC contractor supplying ventilation, air conditioning and self-made ductwork for general contractors across the Czech Republic
400.074.1_4 / Lüftungs- und Klimaanlagen
Fits: Ventilation and air-conditioning systems, self-made ductwork, MaR, heating and smoke extraction installed for construction projects
Los 013 Lüftungstechnik, Neubau Sporthalle Artur-Becker-Oberschule
Fits: Ventilation and air-conditioning systems, self-made ductwork, MaR, heating and smoke extraction installed for construction projects
SCS-ERT-BAII-Lüftungsinstallationsarbeiten
Fits: Ventilation and air-conditioning systems, self-made ductwork, MaR, heating and smoke extraction installed for construction projects
MUR Brandschutzsanierung, Technikzentrale u. Rohrkeller, Heizung, Sanitär u. Gase
Fits: Ventilation and air-conditioning systems, self-made ductwork, MaR, heating and smoke extraction installed for construction projects
Schnieglinger Str. 71 (147a) - Krematorium, Ofensanierung, 075.00 Raumlufttechnische Anlagen
Fits: Ventilation and air-conditioning systems, self-made ductwork, MaR, heating and smoke extraction installed for construction projects
Travaux d'installation, de remplacement et rénovation d'équipements de chauffage et ventilation dans des bâtiments publics
Fits: Ventilation and air-conditioning systems, self-made ductwork, MaR, heating and smoke extraction installed for construction projects
Heizung und Kaelteanlagen
Fits: Ventilation and air-conditioning systems, self-made ductwork, MaR, heating and smoke extraction installed for construction projects
Your public customers are buying
Open tenders from buyers that signed contracts with KLIMASERVIS SŮVA in the last two years (Slovak and Czech contract registers). Everything they tender, not only what KLIMASERVIS SŮVA sells.
Obnova manipulátorů
Obnova VDZ Oblast 4 (SSÚD 11, SSÚD 12)
D7 MUK Aviatická – MÚK Ruzyně 2.etapa – pyrotechnický průzkum
I. tř. KHK Výkon činnosti dendrologa - KHK
Zajištění zimní a kontinuální údržby vybraných úseků silnic I. třídy na období po 30. 9. 2027 oblast 03 Jihočeská
FSV UK – služby ostrahy majetku a osob a recepční služby
Provoz a údržba automatických sčítačů dopravy typu M660 a M680
Provoz a údržba automatických sčítačů dopravy typ ASD3 a ASD3u (2026–2030)
Malý vůz pro sběr odpadků SSÚD Rozvadov
JMK - Rámcová dohoda na stavební práce - opravy vozovek AHV a MA - okr. Znojmo, Břeclav
Rámcová dohoda na služby GTP menších staveb pozemních komunikací 2026
PFUK – Úklid budovy
Obnova VDZ Oblast 6 (SSÚD 13, 14, 33)
I/43 Opatov - Lanškroun, OAK
I/23 Třebíč - Vladislav
Odstraňování následků dopravních nehod na bezpečnostním zařízení a vybavení doplňková oblast Čechy (SSÚD 8, 11, 12, 13, 14, 33)
Odstraňování následků dopravních nehod na bezpečnostním zařízení a vybavení doplňková oblast Morava (SSÚD 7, 21)
FAF UK – dodávka hlubokomrazicího boxu
D1 01313 Připojení BPZ Černovická terasa na D1
I/57 Opava, jižní obchvat, Olomoucká – Bruntálská a I/45 Nové Heřminovy - Zátor, I. etapa; kácení mimolesní zeleně