TLP
Electrical transmission-line engineering and design services for grid operators, developers and property investors
Highlights
- ProfitableFY2025 net profit €12k · RÚZ
- GrowingRevenue +116% YoY (FY2025) · RÚZ
- New on EvolcAdded 2026-11-08
Recent signals
What changed at TLP in the last 6 months, newest first. Each line links to its public source.
- 8 Nov 2026 Turned profitable · Turned profitable in FY2025: €12k net profit after a €259k loss registeruz.sk
- 10 Sep 2026 Public contract · Won €164k public contract from Slovenská elektrizačná prenosová sústava, a.s.: Zmluva o dielo crz.gov.sk
- 16 Jun 2026 Public contract · Won €483k public contract from Slovenská elektrizačná prenosová sústava, a.s.: Zmluva o dielo crz.gov.sk
About TLP
TLP provides design, engineering, advisory and calculation services for high- and extra-high-voltage transmission and distribution lines, including new construction and reconstruction projects. Services cover project documentation, permitting, land and property matters, technical supervision, surveys and measurements.
Its customers include transmission and distribution system operators, developers, investors and individuals or organizations with projects near power-line protection zones. The company is based in Bratislava and has operated since 1993, serving projects in Slovakia and abroad.
Product: Design, engineering, permitting, technical advisory and calculation services for transmission and distribution power lines.
Financials
| FY2025 | FY2024 | FY2023 | FY2022 | FY2021 | |
|---|---|---|---|---|---|
| Revenue | €624k | €289k | €614k | €571k | €540k |
| Growth | +116% | −53% | +8% | +6% | — |
| EBITDA | €38k | −€248k | −€40k | −€48k | −€116k |
| Operating profit | €36k | −€251k | −€44k | −€53k | −€120k |
| Net profit | €12k | −€259k | −€46k | −€54k | −€121k |
| Net margin | 2% | −89.4% | −7.5% | −9.5% | −22.4% |
| Personnel costs | €344k | €386k | €437k | €421k | €434k |
| Total assets | €644k | €442k | €616k | €614k | €543k |
| Cash | €29k | €22k | €49k | €10k | €176k |
| Liabilities | €741k | €551k | €470k | €418k | €293k |
| Equity | −€99k | −€112k | €147k | €193k | €247k |
As filed with RÚZ (Slovak register of financial statements). Each year links to its statement.
Public contracts
Contracts TLP signed since 1 Nov 2024, from the Slovak and Czech public contract registers. Values as published; amendments are not counted.
Customers
3 contracts with 1 buyer · €879k
| Contracts | Value | |
|---|---|---|
| Slovenská elektrizačná prenosová sústava, a.s. | 3 | €879k |
Latest contracts
Jobs at TLP
More energy & climate companies
Topvolt
Installs rooftop solar PV systems for family houses in western Slovakia, including panels, inverters and warranty serviceYoung companyTorreol
Natural gas and electricity supply for commercial energy customers in Slovakia, Austria and the Czech RepublicProfitableGrowingNew on EvolcTRANSPETROL
Slovakia’s oil transportation and storage operator serving the country’s energy sectorProfitableTRISUN
Installs rooftop solar and heat pump systems, with grant paperwork, for homes and firms in SlovakiaYoung companyUCED Servis SK
Installation, reconstruction and maintenance of heating, cooling and piping systems, plus building management, in SlovakiaProfitableGrowingSalary transparentUCED Slovensko
Heat, electricity and gas supply and local energy distribution networks for households and businesses in Slovakia
Website technologies
Tools and platforms detected on this company’s website, grouped by purpose. Dates record when Evolc observed them.
Content management
- WebflowMedium confidence
- First detected
- Last detected
- Last checked
Detection evidence
- Page markupsoftware structure signature
Forms
- Google reCAPTCHAHigh confidence
- First detected
- Last detected
- Last checked
Detection evidence
- Website resourcedeclared script/iframe or software asset
Hosting
- AWSHigh confidence
- First detected
- Last detected
- Last checked
Detection evidence
- Website resourcedeclared script/iframe or software asset
Website detection does not establish a paid subscription or company-wide use. Tools loaded after consent or sign-in may be missed. “No longer observed” does not prove the company stopped using a tool.
