PFProjekt
Road, street and cycle path design and engineering for Czech municipalities and construction investors, from concept to build detail
Highlights
- New on EvolcAdded 2026-11-02
About PFProjekt
PFProjekt s.r.o. is a design studio for transport structures and related infrastructure. Its services cover roads II and III class, junctions, forest and field paths, cycle paths and pedestrian routes, urban streets, car parks and public spaces, as well as investment-construction project preparation and building supervision. Work runs from conceptual design to documentation for construction.
Clients are municipalities and investment builders. The company's reference projects include a parking and road renovation in Slaný, a pavement along a II class road in Tuchlovice, and a cycle path in Lázně Toušeň, several of them co-financed through SFDI or IROP. It also produces 3D models of road layers, BIM models and clash-analysis inputs.
PFProjekt was founded in 2018 and is headquartered in Slaný, Czech Republic, where its registered seat is located. Its listed team covers management and design, engineering activity, and building supervision.
Product: Design and engineering documentation for roads, streets, cycle paths and public spaces, plus 3D and BIM models.
Public contracts
Contracts PFProjekt signed since 1 Nov 2024, from the Slovak and Czech public contract registers. Values as published; amendments are not counted.
Customers
12 contracts with 6 buyers · 2.5M CZK
| Contracts | Value | |
|---|---|---|
| Město Slaný | 6 | 1.6M CZK |
| Město Kralupy nad Vltavou | 1 | 356k CZK |
| Slavos Slaný, s.r.o. | 1 | 284k CZK |
| Město Mělník | 2 | 228k CZK |
| Městská část Praha 22 | 1 | 65k CZK |
| Městská část Praha-Kolovraty | 1 | 34k CZK |
Open public tenders for PFProjekt →
Latest contracts
- 12 May 2026 for Městská část Praha-Kolovraty · Objednávka č. 120/2026 Úprava dopravního značení - cyklostezka · 34k CZK register
- 22 Dec 2025 for Město Slaný · Objednávka - objednávka · 497k CZK register
- 15 Sep 2025 for Město Mělník · Projektová dokumentace – sídliště Pivovar, Mělník - komunikace · 148k CZK register
- 25 Aug 2025 for Město Mělník · PD - Autobusová zastávka Mladoboleslavská · 80k CZK register
- 21 May 2025 for Město Slaný · Objednávka - Objednávka č. 70/2025 · 241k CZK register
- 19 May 2025 for Město Slaný · Objednávka - Slaný, obnova ulice U ploché dráhy · 74k CZK register
Jobs at PFProjekt
Leadership
- Petr Fojt · Jednatel (Managing director)Source: business register
More construction companies
PG Zíma
Gas infrastructure design and geological consulting for project owners and clients in the Czech RepublicNew on EvolcPH MADE
Construction management and project consulting for commercial, industrial and residential developers and property ownersNew on EvolcPHAR SERVICE
Engineering and construction services for pharmaceutical, healthcare, food and chemical industriesNew on EvolcSalary transparentPHS Plus
Custom aluminum glazing, sliding systems, conservatories and pergolas for homes and commercial propertiesNew on EvolcPHTOP
Heating, plumbing, gas and renewable-energy installation and servicing for residential and commercial properties in the Czech RepublicNew on EvolcPIADA
Structural and dynamic analysis of buildings for construction projects across the Czech Republic, based in StrakoniceNew on Evolc
Website technologies
Tools and platforms detected on this company’s website, grouped by purpose. Dates record when Evolc observed them.
Analytics
- Google Tag ManagerMedium confidence
- First detected
- Last detected
- Last checked
Detection evidence
- Integration code on pageinline script loader
Backend
- PHPMedium confidence
- First detected
- Last detected
- Last checked
Detection evidence
- Cookie namedistinctive cookie name
Frontend frameworks
- jQueryHigh confidence
- First detected
- Last detected
- Last checked
Detection evidence
- Website resourcedeclared script/iframe or software asset
Website detection does not establish a paid subscription or company-wide use. Tools loaded after consent or sign-in may be missed. “No longer observed” does not prove the company stopped using a tool.
